Bridge Demolition

Bridge Demolition Sequencing & Temporary Works Design

Andun provide Bridge Demoltion sequencing and temporary works design services to contractors working on infrastructure projects across the United Kingdom.

Our bridge demolition experience range from the demolition of a single span over a brook or stream to 300m viaducts.

We are able to provide design support throughout the lifecycle of a bridge demolition project from tender through to completion of the works.

Bridge types we provide demolition sequencing and temporary works design services for

  • Masonry Arch
  • Through Plate Girder
  • Trusses
  • Concrete Deck Bridges

The design services provided depend on the type of bridge being demolished, the other factors and stakeholders involved and the available resources such as the original drawings and inspection reports.

Where there has not been a recent inspection Andun are able to undertake bridge inspections and provide the relevant reports and stability data.

Our demolition sequences are situation dependent and can facilitate lifting bridges to be broken up away from the original structure location or processed in-situ.

Demolition sequences can also be designed to work around limitations such as limited possession time or working on or near live rail environments and the additional regulations and form submissions.

Temporary Works For Bridge Demolition

Andun can also design the temporary works required to implement the proposed demolition sequence.

Temporary works designs required as part of a bridge demolition can include

  • Propping
  • Crane Platform Design
  • Temporary Restraints Design

If you have an upcoming Bridge demolition project requirement, you can email info@andun.co.uk or call 01245 360 194

Have a demolition project that requires specialist design support?