Andun Engineering Consultants (Andun) provide specialist lifting equipment design for temporary works and demolition projects across the UK.
Andun delivers effective design solutions for projects where access, load or work sequencing challenges require a bespoke design solution.
- Lift beam design
- Tower crane base design
- Crane design
Our specialist knowledge and ability to define innovative solutions to complex problems means that we can provide a full solution from the initial design stage through to project completion.
Where appropriate we utilise the latest 3D modeling and FEA techniques to design, analyse and demonstrate our design solutions.
Recent Case Studies
Bridge Replacement - Mytholmroyd
Replacement of a two-span footbridge over the River Calder in Yorkshire with significant constraints during the demolition and replacement installation phase.
Tower Crane Grillage Design - One Leadenhall
The Bristol Beacon project was a large-scale refurbishment initiative that was completed over a five-year period and involving extensive temporary works design and demolition engineering.
Extensive Temporary Works & Demolition Engineering - Bristol Beacon
The Bristol Beacon project was a large-scale refurbishment initiative that was completed over a five-year period and involving extensive temporary works design and demolition engineering.
Internal Climbing Tower Cranes & Chocking Frames - One Leadenhall
Design and sequencing of two internal climbing tower cranes, including chocking frames and associated temporary works used in the construction of One Leadenhall a 35-storey structure adjacent to Leadenhall Market in Central London.