Rail temporary works & demolition sequencing

Andun have delivered temporary works design and engineering support on some of the largest infrastructure projects of the last two decades.

Our team of temporary works engineers have the experience and expertise to provide high quality temporary works consultancy, design and checking services for rail temporary works projects. This includes rail temporary works designs for Network Rail projects including the completion of the relevant regulatory checks and submissions.

Design Services

The rail temporary works design services we can provide for your project is wide ranging and can include the following

  • Crane Platforms
  • Piling Platforms
  • Demolition schemes
  • Excavation support
  • Hoardings
  • Falsework and Formwork
  • Specialised Lifting Equipment
  • Slope stability assessments
  • Scaffold design
  • Cat 3 Checks 
  • Temporary OLE gantries
  • Scaffold bridges
  • Developing and submitting F001/002/003 submissions
  • Form AA & BA for changes to existing assets
  • CRE and CEM role
Rail Temporary Works Statements and Submissions

For London Underground and DLR we can also provide the following services: 

  • Conceptual design statements
  • Safe load assessments

Andun can also provide Approval In Principle (AIP submissions), which can be required where sites interface with local highway assets, or require modifications to the highway assets.

3D Modelling

Andun utilise the latest technology to design and communicate the proposed design or demolition sequencing solution to project stakeholders.

This includes the use of 3D modelling to create and demonstrate the most effective design solution and where necessary provide innovative rail temporary works designs to meet the contractor’s requirements. 

This can include working within a MicroStation or ProjectWise environment.

Have a rail project that requires temporary works support?