Delivering specialist temporary works design and checking services for the construction industry.
Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.
We have extensive experience on large infrastructure and redevelopment projects across the UK.
Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.
Recent Case Studies

Post-Tensioned Bridge Demolition- Spence Lane
Demolition of a post-tensioned footbridge in Leeds city within a strict time period with constrained crane heights and a limited collapse radius.

Post-Tensioned Rail Bridge Demolition- M62 Castleton
Demolition of a post-tensioned railway bridge deck over the M62. Existing abutments and the central pier were retained for the replacement bridge.

Demolition Engineering - Newport Centre
Demolition of a sports centre in Newport. Requiring complex demolition engineering due to the complexity of the structure, proximity to the main road and basement groundwater.

Bridge Demolition - Darby House Footbridge Dismantling
Andun were appointed to undertake the demolition engineering for the dismantling of Darby House footbridge. This project was particularly complex due to the articulation of the structure.